Products

Get the latest price? We will reply as soon as possible (within 12 hours)

Automated Workover Rig for Oil Well Sidetrack: DW20, Daqing

2026-04-10

Automated Workover Rig Oil Well Sidetrack: DW20 at Daqing Oilfield

CORTECH DW20 automated workover rig performing oil well sidetrack at Daqing Oilfield
Executive Summary

Daqing Oilfield — one of China's largest mature fields — is in its mid-to-late development phase: many old wells, and a heavy, steady demand for workover and sidetrack operations. Conventional workover rigs were manually operated: extremely labor-intensive, slow, accident-prone, with data that could not be traced. Jinneng Drilling developed the DW20 automated integrated drilling-and-workover rig — a fully electro-hydraulic dual-control machine with an automatic tubular-handling system, remote operating platform and data acquisition & traceability system. Compatible with drilling, workover, sidetrack and re-perforating, and built for high-temperature, high-corrosion oilfield service, the DW20 cut single-well workover cycle by 50%, reduced labor by 60%, and drove safety accidents to zero — and has since been rolled out across multiple Daqing blocks.

Project Background & Challenge

Mature oilfields live or die by workover efficiency:

  • Aging well stock: Daqing is in mid-to-late development, so old wells need repeated workover and sidetrack to keep production flowing.
  • Manual, hard and risky: traditional workover depended on hands-on manual operation — very high labor intensity, low efficiency, frequent safety incidents, and no usable construction record.
  • Intelligent-field mismatch: the old approach could not support the oilfield's push toward smarter, more efficient, data-driven operations.

What was needed was one machine that could drill, work over, sidetrack and re-perforate; survive high-temperature, high-corrosion service; and run unmanned with remote control.

Our Solution

The DW20 automated integrated drilling-and-workover rig was built for exactly that:

  • Full electro-hydraulic dual control: combines electric and hydraulic control for precise, repeatable rig movements.
  • Automatic tubular-handling system: makes up and breaks out tubing and rods without manual handling on the rig floor.
  • Remote operating platform: crews operate from a remote station instead of on the dangerous rig floor.
  • Data acquisition & traceability system: every job is recorded, so workover history is traceable per well.
  • Multi-process compatibility: handles workover, sidetrack and re-perforating across the oilfield's high-temperature, high-corrosion well conditions, with unmanned remote operation.

Key Results

Metric Value
Single-well workover cycle Shortened by 50%
Labor requirement Reduced by 60%
Safety accidents Reduced to zero
Operations supported Drilling, workover, sidetrack, re-perforating
Control architecture Full electro-hydraulic dual control; remote operation; unmanned
Data Automatic acquisition and traceability per well
Field deployment Rolled out across multiple Daqing blocks
Equipment status Stable operation, high reliability

For the full technical specifications of the CORTECH® DW20, see the DW20 product page.

Customer Value & ROI

  • Half the cycle, 60% less labor: shorter single-well workover means more wells serviced per season and lower day-rate cost; the headcount drop directly cuts one of the largest mature-field operating costs.
  • Zero accidents: moving people off the rig floor to a remote station removed the dominant safety risk in manual workover.
  • Data you can audit: per-well recorded data gives the operator traceability for compliance, planning and failure analysis.
  • One machine, many jobs: compatibility across drilling, workover, sidetrack and re-perforating reduces the number of specialized rigs a block must own and mobilize.

FAQ

What is an automated workover rig?

It is a workover machine that replaces manual rig-floor labor with automated tubular handling, electro-hydraulic control and remote operation — as on the DW20, which also covers sidetracking and re-perforating.

How much can automation cut workover cycle time?

In the Daqing deployment, the DW20 shortened single-well workover cycle by 50%, cut labor by 60%, and drove safety accidents to zero.

Can a workover rig perform sidetracking?

Yes — the DW20 is an integrated drilling-and-workover rig designed to handle workover, sidetrack and re-perforating on the same unit across high-temperature, high-corrosion well conditions.

What is remote, unmanned workover operation?

Operators run the rig from a remote platform while an automatic tubular-handling system makes up and breaks out the string, with continuous data acquisition — keeping personnel off the dangerous rig floor.

Internal Links

  • Rig product page
  • Application hub
  • Related case
  • Related case (cross-hub)
  • Related case (cross-hub)
  • FAQ knowledge base